{"id":22646,"date":"2025-02-03T06:33:53","date_gmt":"2025-02-03T06:33:53","guid":{"rendered":"https:\/\/www.diplomacypakistan.com\/?p=22646"},"modified":"2025-02-03T06:33:53","modified_gmt":"2025-02-03T06:33:53","slug":"world-bank-to-grant-1bn-loan-for-dasu-hydropower-expansion","status":"publish","type":"post","link":"https:\/\/www.diplomacypakistan.com\/?p=22646","title":{"rendered":"World Bank to grant $1bn loan for Dasu hydropower expansion"},"content":{"rendered":"<p>The World Bank (WB) is set to issue a fresh $1 billion loan for the first phase of the Dasu hydropower project, following the approval of a revised PC-1 with updated completion timelines. A senior official of the Economic Affairs Division (EAD) revealed that cost of the first stage of the project has shot up by 190.1% to Rs1,700 billion from Rs586 billion. The increase in the cost is attributed mainly to a delay in land acquisition, security concerns and an increase of US dollar value by 178%. \u201cThe project of stage I would generate 2,160 MWs. However, after erecting stage II of the project, it would generate 4,320 MWs. Dasu Hydropower Project is a run-river project on the Indus River located seven kilometres upstream of Dasu Town, District Kohistan (Upper), Khyber Pakhtunkhwa. &#8220;The site is 74km downstream of the proposed Diamer Bhasha Dam site and 345km from Islamabad. The project will generate 4,320 MWs (12 Units @ 360 MW each) hydroelectric power with annual energy of 21,445 GWh and will be developed in two stages (Stage I and II). &#8220;Stage I will generate 2,160 MW (06 Units @ 360MW each) with annual energy of 12,222 GWh. Stage I will be completed in five years. The WB has already given the loan of $588 million and also extended the guarantee leverage for generating $460 million from the international market.\u201d However, under the new financing for the project, out of $1 billion, $800 million loan is of International Development Association (IDA) and $200 million will be extended under the International Bank for Reconstruction and Development (IBRD). Out of the IDA loan, Pakistan will attain $435 million at zero interest rate, $365 million at 5.83% interest rate, and get $200 million under IBRD at 6.13% interest rate. &#8220;We have prepared the revised PC-1 of the project at the cost of Rs1,700 billion and will send it within a couple of days to the Planning Commission for its approval. After that, Water and Power Development Authority (Wapda) and WB will formally sign the $1 billion (loan),&#8221; the Ministry of Water Resources confirmed. The land acquisition for the dam project was to be completed by 2014, but the process finished in 2021-22. Another reason for the escalating cost is the appreciation of US dollar by 178% to Rs278 from Rs100. &#8220;The project was earlier scheduled to get completed by 2023-24 which would now be completed by 2027-28. The Economic Affairs Division has played a pivotal role in diverting the bank\u2019s loan to the project of paramount importance. The WB has already extended $1 billion loan to Pakistan in other heads, but it was not being spent. This is why the loan has been re-purposed and diverted to the Dasu Dam with the approval of the executive board of the bank,&#8221; added the ministry.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The World Bank (WB) is set to issue a fresh $1 billion loan for the first phase of the Dasu hydropower project, following the approval&#8230;<\/p>\n","protected":false},"author":1,"featured_media":22647,"comment_status":"registered_only","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[16],"tags":[],"class_list":["post-22646","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business"],"aioseo_notices":[],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=\/wp\/v2\/posts\/22646","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22646"}],"version-history":[{"count":0,"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=\/wp\/v2\/posts\/22646\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=\/wp\/v2\/media\/22647"}],"wp:attachment":[{"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22646"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22646"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.diplomacypakistan.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22646"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}